Civic Vision Independent Concept Study
The Kettletown Estate Crest
THE KETTLETOWN ESTATE

228-Acre Adaptive Reuse

Crest
The Kettletown Estate
Campus Navigation Concierge
Civic Fact Audit & Scenario Analysis 16 AUDITS
Municipal Sourcing & Diligence Audit

$1.016M/yr tax math verified, $0 school impact, and 16 stakeholder teardowns.

Public Review & Feedback Named or Anon Request Feasibility Study
Southbury PID 4383 IND Zoning Enacted
Solar Canopies and Bioswales
Expand High-Res View
Aquifer Conservation 380,000 SF Depaved
Former Lower Commuter Lots • Pomperaug River Basin

Depaving & Aquifer Hydrology Master Plan

Reversing 40 years of suburban asphalt runoff. The master plan removes 380,000 SF (8.72 acres) of redundant impervious parking lots, transforming hot asphalt into native pollinator meadows, deep-root bioswales, and seasonal rain gardens that naturally recharge the Pomperaug aquifer.

Pomperaug Aquifer Recharge: 5.17M to 7.85M gallons of filtered water recharged annually
CT DEEP 2024 Compliance: Exceeds new state stormwater standards with 80%+ TSS removal
4.2 MW Solar Canopy Microgrid: Bi-facial solar panels shield cars & eliminate heat island effect
Wildflower Meadows Replacing Asphalt
8.72 Acres Depaved

Asphalt to Living Meadow

By eliminating the excessive parking lots engineered for 1980s solo commuters, we restore 8.72 acres to productive ecological meadow. Deep-rooted prairie grasses break up compacted soil and absorb torrential rain events.

• Native New England Seed Mixes & Pollinator Forbs
• Eliminates Asphalt Sealant Chemical Leaching (PAHs)
• Lowers Microclimate Ambient Temp by 8–12°F in Summer
Engineered Infiltration Bioswales
Natural Filtration

Tiered Infiltration Swales

Rather than channeling stormwater into concrete pipes that overwhelm downstream culverts, run-off is redirected through terraced rock channels and vegetative bio-filters that capture sediments and recharge groundwater.

• 80%+ Total Suspended Solids (TSS) Removal Efficiency
• Zero Mechanical Pumping or Energy Requirements
• Subsurface Stone Storage Cells for 100-Year Storms
Watershed Satellite Topography
Ridge Drainage Protection

Pomperaug River Basin Safety

Per USGS hydrologic data, the 228-acre campus sits on an upland bedrock plateau with 98.3% of its watershed draining into the Pomperaug River system. Modern depaving stops localized erosion along Bullet Hill Road.

• 98.3% Watershed Alignment with Pomperaug Valley Aquifer
• Slows Peak Storm Discharge Velocity by 44%
• Safeguards Local Drinking Water Well Fields
Empirical Hydrologic Engineering

TR-55 Runoff Volume Comparison

Per 1-Inch Storm Event Over 768,500 SF Parking Footprint
Status Quo (1987 Design)

All-Asphalt Impervious Lot

479,000 Gal

100% impervious asphalt flushes hot oil, rubber dust, and silt directly into road ditches and surface streams at high velocity, causing downstream riverbank scouring.

Kettletown Estate Master Plan

380k SF Depaved + Bioswales

142,000 Gal Net Runoff

70.4% reduction in peak surface runoff volume. 337,000 gallons per storm captured in permeable sub-base and restored meadows, recharging the town aquifer.

Annual Cumulative Benefit

Net Clean Aquifer Recharge

5.17M–7.85M Gal/Yr

Over Southbury's average 48 inches of annual rainfall, the project replenishes millions of gallons of naturally filtered clean water into the local water table.

CT DEEP 2024 Stormwater Quality Compliance

Exceeds the updated Connecticut Department of Energy and Environmental Protection (DEEP) guidelines by maintaining zero net increase in peak runoff rate and integrating natural low-impact development (LID) throughout.

View Technical Addendum
Regional Conservation Precedent • June 2026
CT DEEP OSWA • $1,293,500 Award

State Awards $1.29 Million to Southbury Land Trust for 148-Acre DuPont Farm

On June 23, 2026, Governor Ned Lamont and CT DEEP Commissioner Katie Dykes awarded $1,293,500 to the Southbury Land Trust (SLT) through the Open Space and Watershed Land Acquisition Grant Program (OSWA)—the largest state grant in SLT history. The grant preserves the 148-acre DuPont Farm along Hulls Hill Road in Southbury and Oxford, safeguarding four vernal pools, perennial springs, and headwaters feeding Eight Mile Brook while connecting Southford Falls State Park to a 340-acre Oxford open space parcel.

Direct Civic Alignment: Kettletown's civil master plan operates on this identical conservation ethos. By depaving 8.72 acres (380,000 SF) of redundant asphalt and dedicating 200+ acres of its 228-acre parcel to permanent conservation easements and arboretum trails, Kettletown recharges 5.17M–7.85M gallons annually into the Pomperaug aquifer basin while reinforcing Southbury's regional open space corridors.

*(Note: Regional conservation projects are cited as planning benchmarks; the Southbury Land Trust has not reviewed or endorsed this civic concept.)*

Technical Environmental Library

Download the Hydrology & Depaving Study

Receive the technical hydrology briefing outlining TR-55 stormwater runoff methodologies, aquifer recharge models, and CT DEEP stormwater compliance framework.

Delivered electronically from the Kettletown Estate Civic Master Plan technical library.